Yazaki Corporation HQ, Detroit
Masted cable supported facade system wall systems wrap this HQ project. the glazed high transparency walls are also used as a warm air buffer for the building by utilizing floor and roof vents for controlled air movements. The masted trusses were pre-tensioned in the shop and shipped to site for final install. The glazing system uses the Pilkington Planar drill glass and fitting system for IG units.
Facade Contractor: Advanced Structures, Inc. (Work conducted while at ASI)